Park Alerts
W&OD Trail: July 2024-February2025: Dominion Energy will replace the electric transmission wires along the W&OD Trail
Dominion Energy will replace the conductor, or wires, on the electric transmission line above the W&OD Trail between Mill St NE in the Town of Vienna and Sandburg St in Dunn Loring (Mile Markers 9-12). Trail users can expect temporary traffic stops and detours.
- July 2024-November 2024: Expect stops up to 15 minutes while crews prepare for wire replacement. Flaggers will control traffic.
- November 2024 (1-2 weeks, weekdays only): Trail section will be closed during wire replacement and trail users will be directed to a detour.
-
November 2024-January 2025: Expect stops up to 15 minutes while crews complete the project. Flaggers will control traffic.
More information is available at https://www.dominionenergy.com/clarkidylwood and the detour route will be posted once finalized. To ask questions or connect with the Dominion Energy team, call (888) 291-0190 or email powerline@dominionenergy.com.